Project Case

  • Rizhao Port Shijiu Port District East Coal Moves South

Rizhao Port Shijiu Port District East Coal Moves South

Update time:2020-08-05
Inquiry

→Product Introduction

It is planned to build 21 belt conveyors for coal unloading, stacking, transfer, reclaiming and ship loading, of which, there are 10 belt conveyors for unloading and stacking processes, with a rated conveying capacity of 3600t/h, a bandwidth of 1.8m, and a belt speed of 4.0m/s; There are 11 belt conveyors in the reclaiming and loading process, with a rated conveying capacity of 6000t/h, a bandwidth of 2.2m, and a belt speed of 4.3m/s.

The belt conveyor system of east coal south transfer material loading line.

11 belt conveyors, rated conveying capacity 6000t/h, bandwidth 2.2m, belt speed 4.3m/s
11 belt conveyors, rated capacity 6000t / h, belt width 2.2m, belt speed 4.3m/s.


case-1.jpg


Related suggestion

Online consultation

Submit