News
On June 19,2021, the first 6000 horsepower oil spilling recovery tug launching ceremony was held in Rizhao base of Shandong Equipment Group.
The ship, started construction in the end of December 2020, covers a total length of 41m, design draft of 4m, sea trial speed of 14 knots, and maximum reverse drag force of 60 tons, which can meet the requirements of large ships berthing, oil spilling recovery on the sea, and FiFi-1 level of external firefighting. After the delivery and operation, the ship will further improve the ship service function and enhance the port service level, which is of great significance to the maintenance of maritime traffic safety.
Request a Free Estimate